piles相关论文
十六年前我学到了人生中重要的一课,那是在纽约市的出租车后座上。 我钻进了一辆出租车,出发去中央火车站。我们开在右侧道上,突然......
At present,the thrust of an anti-slide pile can be worked out with some calculation methods. However,the resistance in f......
This paper involves a series of destructive full-scale load tests on long bored piles instrumented with strain gauges al......
The high-frequency interference exists obviously in low strain integrity testing of large-diameter pipe pile when a tran......
In this paper,a semi-analytical method for the analysis of pile-supported embankments is proposed.The mathematic model d......
The finite element limit analysis method has the advantages of both numerical and traditional limit equilibrium techniqu......
—In the designing of the flexible fender pile,M-method is usually adopted.But M-method isusable only in the case that t......
Construction of tunnels in urban areas requires assessment of the impact of tunneling on the stability and integrity of ......
主要介绍了2根桩试成孔连续跟踪监测试验成果.结果表明,钻孔灌注桩成孔后,随着空孔时间增长,其桩孔孔壁会出现坍塌,局部孔径增大,......
某工程钻孔灌注桩项目采用长螺旋钻机预先成孔,随后通过中空螺旋钻杆将超流态混凝土压至钻头底部,边提钻边浇筑混凝土,浇筑完成后......
长螺旋钻孔压灌桩施工易受地质条件、桩长、桩径、施工工艺突出等因素影响,若在复杂地质条件下施工,塌孔、钻进困难及钢筋笼难以下......
郑万铁路奉节梅溪河双线特大桥主桥设计为1-340m劲性骨架钢筋混凝土上承式提篮拱桥,拱座采用水平桩+竖直桩分离式嵌固基础,X形钢管......

